Three Steps: 01 Fixation, 02 Verification, 03 Report
Step 01 “Fixing”: what exactly we shoot and what metadata we collect
- Photo fixation: pallet, packaging, individual label, group box, documents, barcodes.
- Metadata: SKU, lot number, production dates and expiration date, country of origin.
- Identification of responsible employees and the exact time of shooting.
- Archival binding of photos and metadata to the batch number in the warehouse system.
Step 02 “Verification”: what requirements and references we use
Step 03 Report: what is ready, what to rule before shipment, what to carry in escalation
Economy: where does the range of 200-800 euros on a pallet come from
- Place step 01 "Fixing" in the standard warehouse acceptance cycle before repackaging.
- Run step 02 "Verification" by checklist 1169/2011, 178/2002 and 852/2004 and category directories.
- Form step 03 "Report" with three statuses and fix the owners of edits.
- After two cycles, check the planned and actual indicators - which SKUs are stable, where changes are required regularly.
- Connect the report to the dialog with the manufacturer to improve the quality of batches at the source.
